Magnes is advancing Minas Americas in Minas Gerais, with a magnet rare-earth focus that includes dysprosium and terbium. Near-surface drilling and selected laboratory tests are informing the next resource and processing studies.
Exploration stage. Mineral resources, commercial recovery and project economics have not been established.
879holes in the assay compilation
7,468.8 massayed
Compilation cutoff: 25 September 2026
The opportunity / Three questions to start with
01
Why magnet rare earths?
Neodymium, praseodymium, dysprosium and terbium are used in permanent magnets. Dy and Tb are the heavy rare earths within this magnet basket, and both feature in the Minas Americas drilling record.
Reported intervals from surface and selected leach tests provide a basis for further work. Scale, consistency and a viable product route still need to be established.
The published drilling record includes broad intervals from surface. These observations support further geological and processing work; they do not yet establish a resource or an economic project.
MREO means the oxides of neodymium, praseodymium, dysprosium and terbium—the four magnet rare-earth elements used in these summaries.
Selected RC interval from surface30 m
1,853 ppm MREO
MAV_RC_0063, from surface. This is a selected head-grade interval.
Dysprosium, terbium and the heavies270 ppm
HREO over 30 m
Including 60 ppm DyTb (combined dysprosium and terbium oxides) in MAV_RC_0063. HREO also includes non-magnet elements. DyTb is included in both HREO and MREO; the groups must not be added.
Exploration-stage project. Selected head-grade drilled intervals, not recovered grades. True widths and continuity between holes are not established. Nested intervals are included, not additional metres. MREO and HREO overlap through DyTb and must not be added. No mineral resource, reserve, commercial recovery or economic result is established.
Selected laboratory tests measured rare-earth concentrations in solution and wash liquids. The estimated amounts help guide further process testing; they are not a project-wide average or a commercial recovery result.
Estimated MREO in solution + both washesUp to 982 g/t
Per tonne of prepared −2 mm laboratory feed.
7 samples / 4 holes
Selected geological material, plus one separate QC repeat.
30-minute main leaches
Ambient temperature; ammonium sulphate at nominal pH 4.2, followed by two washes.
Next: integrated testwork
Resource preparation, a characterized concentrate and a wider variability programme.
Company-calculated oxide equivalents using nominal liquid volumes, not actual collected-liquid yields. SGS describes the underlying balance as a maximum-recovery calculation. These are not physically produced oxides, whole-ore product yields or finished-product recovery.
The two highest results are adjacent intervals in MAV_AD_0115. Selection has not been shown to represent the wider project. MREO = Nd, Pr, Dy and Tb oxides.
Outlined bar: QC repeat of sample 1109, not an eighth geological sample. One-metre downhole intervals; true mineralized widths are undetermined.
Sample origins: MAV_AD_0013, MAV_AD_0068, MAV_AD_0113 and MAV_AD_0115. See the published drill-hole reference positions (SIRGAS 2000 / UTM 23S). These are source-field reference positions; displayed precision does not establish independent survey accuracy.
The next question: How consistently can representative material be processed through to a specified product? Integrated testing and a wider sample programme must establish that.
Source: SGS release · 17 November 2026, Tables 2–3 and the test conditions, reporting basis and technical disclosure. The release identifies Carlos Leite as the Qualified Person who reviewed and approved its exploration scientific and technical information.
Initial resource preparation, integrated ANSTO testing and a wider SGS campaign address scale, a potential product pathway and variability. Each answers a different investment question; the plans remain result-dependent.
Dated source · selected evidence
7 samples · 4 holes
55–982 g/t estimated MREO in primary solution plus both washes, per tonne of prepared minus-2 mm feed. Nominal-volume calculations, not actual liquid yields or finished-product recovery.
01 / In progress
Resource preparation
What scale, grade and continuity can the drilling support?
Geological interpretation and resource preparation remain in progress. No mineral resource, reserve, mine plan or economic study is announced.
Next evidence to assess
An initial mineral-resource estimate and supporting report, with the geological interpretation and estimation assumptions.
What would strengthen or weaken the case
Would strengthen
Coherent mineralised domains and a defensible estimate supported by drilling density, continuity and QA/QC.
Would weaken
Limited continuity, unresolved geometry or data coverage that constrains the scale or confidence of an estimate.
02 / Dispatch reported · receipt unconfirmed
Integrated ANSTO testing
Can the process carry rare earths through to a specified intermediate?
Dated update · 23 October 2026: dispatch was reported on 23 October 2026; receipt is expected on 30 October 2026. Receipt and testing commencement are unconfirmed.
Next evidence to assess
Leaching, solid–liquid separation and impurity removal through a characterised mixed rare-earth carbonate for preliminary processor evaluation, not direct magnet use.
What would strengthen or weaken the case
Would strengthen
A reconciled full-process mass balance, manageable impurity and reagent requirements, and a characterised product suitable for processor evaluation.
Would weaken
Significant rare-earth losses, difficult impurity removal, high reagent or water demand, or a product that does not meet the intended specifications.
03 / Planned · dozens of samples
Wider SGS variability programme
How does processing behaviour vary across the project?
Assess geological and metallurgical domains, leach response, impurities and area-specific processing requirements. The selected bench tests have not been shown to represent the wider project.
Next evidence to assess
Results from a broader range of geological and metallurgical domains, with sample selection, test conditions and variability explained.
What would strengthen or weaken the case
Would strengthen
A repeatable response across representative material, with any area-specific processing requirements understood.
Would weaken
Low or highly variable extraction, difficult impurities or results confined to a narrow selection of material.
Dated drilling base: 879 compiled assay holes, disclosed on 6 October using a 25 September cutoff. These are not updated totals for the physical programme. The SGS source adds no new resource or PEA date.
Founder and CEO Cristiano Veloso previously led the platform that became Verde through exploration, production and industrial expansion.
The prior platform reported installed mineral-fertilizer production capacity of up to 3.0 Mtpa in May 2023. Installed capacity is not actual production.
The image and operating record concern Amazon Mining/Verde, not Magnes facilities, funding or project economics. Minas Americas remains at exploration stage.
Your next step
Understand the opportunity. Understand your access.
Read the concise brief, examine the evidence or speak with investor relations about the disclosed project and investment route.
How can I invest?
Magnes is Verde AgriTech’s subsidiary. The disclosed public-market route is through Verde; that is exposure to Verde as a whole, including Magnes. No separately traded Magnes security is disclosed.